Mercredi 28 Sept 2016 17:30 - Mercredi 28 Sept 2016 20:30 | 20.00$ - 45.00$ |
|
Événement
ASCE COPRI Seattle Chapter Monthly Dinner Meeting - Sep 28, 2016
Topic: Port of Tacoma Pier 4 Reconfiguration Project Description: As an initial step in constructing the first big ship ready container terminal in the Pacific Northwest, the Port of Tacoma has embarked on a series of wharf upgrade projects at Piers 3 and 4 to accommodate berthing two Ultra Large Container Vessels (ULCVs). An unusual kinked pierhead line configuration, a waterway width restriction, a 64-foot gauge crane rail system, and mooring and berthing components sized for smaller vessels require a structural upgrade of Pier 3 and a complete reconfiguration of Pier 4.
This presentation will focus on the approach taken to upgrade Pier 4 and provides an overview of the project, design criteria, and solutions implemented.
Speakers: Scott Kuebler, PE, SE and Tripp Howard, PE
Mr. Scott Kuebler, P.E., S.E. is a Principal with KPFF Consulting Engineers and has over 19 years of design and project management experience on a wide variety of port-facility structures, ranging from performance-based seismic analysis of new container/break-bulk wharves to the design of upgrades to a 100+ year old historic wharf and warehouse. Scott is a leader of KPFFs waterfront structural engineering group.
Mr. Tripp Howard, P.E. is a Senior Structural Engineer with KPFF Consulting Engineers and has over 18 years of experience in the design and project management of a wide variety of structures built in the marine environment, including condition assessments and retrofit construction of waterfront structures for port facilities.
|
|
 |
AdresseMirabella Seattle (Afficher)
116 Fairview Ave N
Seattle, WA 98109
United States
Carte en cours de chargement...
In order to see the map for this event, click the Privacy icon in the lower left corner of your screen and grant consent for Google Maps.
The Privacy icon looks like this:

Catégories
Enfants bienvenus : Non |
Chiens bienvenus : Non |
Non-fumeur : Oui |
Accessible aux fauteuils roulants : Oui |
|
Contact
Participants
Lorne A.
Hart Crowser
Tacoma, WA United States
26 Sept 2016 13:51 |
Doug L.
Hart Crowser
Seattle, WA United States
26 Sept 2016 13:42 |
Ellis B.
KPFF
Seattle, WA United States
26 Sept 2016 10:04 |
Trevor L.
KPFF Consulting Engineers
Seattle, WA United States
26 Sept 2016 10:00 |
Willy A.
Reid Middleton
Bothell, WA United States
23 Sept 2016 16:42 |
Jim P.
Concrete Technology
Puyallup, WA United States
23 Sept 2016 15:19 |
Ed D.
KPFF
Everett, WA United States
23 Sept 2016 10:14 |
Ruta I.
CH2M
Seattle, WA United States
22 Sept 2016 12:17 |
Bruce E.
KPFF
Seattle, WA United States
21 Sept 2016 7:34 |
Elise G.
Port of Everett
Everett, WA United States
20 Sept 2016 16:14 |
Steve H.
Port of Everett
Everett, WA United States
20 Sept 2016 13:50 |
John K.
Port of Everett
Everett, WA United States
20 Sept 2016 13:50 |
Peggy C.
Morratt & Nichol
Seattle, WA United States
20 Sept 2016 12:15 |
Bruce O.
Moffatt & Nichol
Puyallup, WA United States
20 Sept 2016 11:43 |
David P.
GeoEngineers, Inc.
Burley, WA United States
19 Sept 2016 9:05 |
Dale C.
Hart Crowser
Edmonds, WA United States
15 Sept 2016 13:44 |
|